
WP4 · Validation and Project Impact Monitoring
Validation of the parametric insurance model and measurement of its socio-economic and environmental impacts, to reduce the climate insurance protection gap.
The work package
The main objective of WP4 is to validate the parametric insurance model and measure its socio-economic and environmental impacts, ensuring that the proposed solution is effective, reliable and capable of reducing the climate insurance protection gap.
Specific objectives are:
- To assess the adequacy and effectiveness of the parametric insurance prototype (T4.1);
- To validate the quantification method based on integrated satellite and field data as the basis for transparent parametric payouts and reliable measurement of climate-related economic losses (T4.1, T4.3);
- To monitor and evaluate socio-economic impacts, including insurance penetration and adoption of adaptation practices, using KPIs and LIFE Performance Indicators (T4.2);
- To evaluate the project’s contribution to reducing uninsured losses and closing the climate insurance protection gap (T4.3).
Expected results include:
- A validated and tested parametric insurance prototype ready for replication and scaling;
- A robust methodology for transparent verification of damages and adaptation practices through combined satellite and IoT data;
- Evidence of the socio-economic benefits of the insurance model, including improved uptake and reduced vulnerability of farmers;
- Demonstrated reduction of the protection gap in pilot regions, providing measurable proof of the project’s added value at EU level.
SO4 · Validation — To validate the insurance model and measure its economic and social impact: assessment of the parametric insurance prototype, validation of the quantification method based on integrated satellite and field data, monitoring of socio-economic impacts with KPIs and LIFE indicators, and evaluation of the contribution to reducing the climate insurance protection gap.
- Lead partner UNIFI-DIEF
- PeriodM13–M36 (Jul 2027 – Jun 2029)
- Task3
- Deliverable3
Timeline
The timeline as a table
| Work package and tasks | Period | Milestone | Deliverable |
|---|---|---|---|
| WP4 Validation and Project Impact Monitoring | M13–M36 (Jul 2027 – Jun 2029) | MS5 · Release of Mid Assessment Report · M32 | D4.1 · Report on Parametric Insurance Model Assessment, including Monitoring Protocols and Surveying Tools · M20 D4.2 · Mid-term Impact Monitoring and Evaluation Report, including LIFE KPI extract · M25 D4.3 · Final Impact Monitoring and Evaluation Report, including LIFE KPI extract · M36 |
| T4.1 Assessment procedure for the parametric insurance model | M13–M36 (Jul 2027 – Jun 2029) · progress 0% | ||
| T4.2 Monitoring and evaluation of the socio-economic impact on local economy and population (KPIs and LPIs) | M13–M36 (Jul 2027 – Jun 2029) · progress 0% | ||
| T4.3 Monitoring and evaluation of the impact on the targeted problem (protection gap reduction, adaptation practices) | M13–M36 (Jul 2027 – Jun 2029) · progress 0% |
Activities (tasks)
- T4.1Assessment procedure for the parametric insurance model Planned
M13–M36 · Lead UNIFI-DIEF
Participants: GENERALI, CNR-IBE, NOA, AgriZapp, UNIROMA1, Agr.Ferrocinto, Tenute Librandi, Genagricola, GLA - T4.2Monitoring and evaluation of the socio-economic impact on local economy and population (KPIs and LPIs) Planned
M13–M36 · Lead NOA
Participants: UNIFI-DSG, UNIFI-DIEF, GENERALI, Genagricola, ASNACODI, GLA, Tenute Librandi, Agr.Ferrocinto - T4.3Monitoring and evaluation of the impact on the targeted problem (protection gap reduction, adaptation practices) Planned
M13–M36 · Lead CNR-IBE
Participants: UNIFI-DAGRI, NOA, UNIROMA1, GENERALI
Milestones and deliverables
- MS5Release of Mid Assessment Report M32
Lead UNIFI-DIEF - D4.1Report on Parametric Insurance Model Assessment, including Monitoring Protocols and Surveying Tools M20 · SEN
Lead UNIFI-DIEF - D4.2Mid-term Impact Monitoring and Evaluation Report, including LIFE KPI extract M25 · PU
Lead NOA - D4.3Final Impact Monitoring and Evaluation Report, including LIFE KPI extract M36 · PU
Lead UNIFI-DIEF