WP2 · Co-design Framework and Risk Modelling

Innovative climate insurance frameworks and risk models co-designed through a participatory, evidence-based approach with farmers, insurers and public authorities.

The work package

The main objective of WP2 is to co-design innovative climate insurance frameworks and risk models through a participatory, evidence-based approach that actively involves farmers, insurers and public authorities.

Specific objectives are:

  • To analyse climatic drivers and socio-economic barriers to climate insurance uptake in the pilot regions (T2.1);
  • To model the impact of extreme events on key crops and identify feasible adaptation measures (T2.2);
  • To conduct participatory co-design workshops with farmers, insurers and local authorities to define parametric triggers and adaptation incentives (T2.3);
  • To develop a modelling framework for adaptive premium schemes and transparent parametric payouts (T2.4).

Expected results include:

  • A comprehensive dataset and analytical report on climatic drivers and socio-economic barriers to insurance adoption;
  • Risk assessment models quantifying the potential impacts of droughts, floods and heatwaves on selected crops, together with feasible adaptation options;
  • Shared design of parametric triggers and incentives, validated through multi-stakeholder workshops;
  • A tested modelling framework linking agro-climatic data, adaptive practices and insurance mechanisms, providing the methodological foundation for the technological integration (WP3) and validation (WP4).

SO2 · Co-design — To co-design climate insurance frameworks and risk models with farmers, insurers and public authorities: analysis of climatic drivers and socio-economic barriers in the pilot regions, risk modelling of extreme events on key crops, participatory workshops to define parametric triggers and adaptation incentives, and a framework for adaptive premiums and payouts.

  • Lead partner CNR-IBE
  • PeriodM1–M18 (Jul 2026 – Dec 2027)
  • Task4
  • Deliverable2

Timeline

Activity
WP2 Co-design Framework and Risk Modelling
T2.1 Climatic drivers analysis and socio-economic barriers to climate insurance uptake in pilot regions
T2.2 Risk analysis: impact of extreme events and feasible adaptation measures
T2.3 Participatory co-design workshops
T2.4 Modelling framework for parametric payouts and adaptive premium schemes
The timeline as a table
Work package and tasksPeriodMilestoneDeliverable
WP2 Co-design Framework and Risk ModellingM1–M18 (Jul 2026 – Dec 2027)MS2 · Database of climatic drivers and socio-economic barriers completed · M10
MS3 · Co-design workshops successfully implemented · M14
D2.1 · Report on drivers, barriers and risk modelling · M10
D2.2 · Framework for adaptive premiums and payouts · M18
T2.1 Climatic drivers analysis and socio-economic barriers to climate insurance uptake in pilot regionsM1–M18 (Jul 2026 – Dec 2027) · progress 0%
T2.2 Risk analysis: impact of extreme events and feasible adaptation measuresM1–M18 (Jul 2026 – Dec 2027) · progress 0%
T2.3 Participatory co-design workshopsM1–M18 (Jul 2026 – Dec 2027) · progress 0%
T2.4 Modelling framework for parametric payouts and adaptive premium schemesM1–M18 (Jul 2026 – Dec 2027) · progress 0%

Activities (tasks)

  • T2.1Climatic drivers analysis and socio-economic barriers to climate insurance uptake in pilot regions Planned
    M1–M18 · Lead CNR-IBE
    Participants: NOA, UNIROMA1, UNIFI-DAGRI
  • T2.2Risk analysis: impact of extreme events and feasible adaptation measures Planned
    M1–M18 · Lead CNR-IBE
    Participants: AgriZapp, Agr.Ferrocinto, Tenute Librandi, GLA, Genagricola, UNIFI-DAGRI
  • T2.3Participatory co-design workshops Planned
    M1–M18 · Lead UNIFI-DSG
    Participants: GLA, Agr.Ferrocinto, Tenute Librandi, Genagricola, GENERALI, ASNACODI, NOA
  • T2.4Modelling framework for parametric payouts and adaptive premium schemes Planned
    M1–M18 · Lead NOA
    Participants: CNR-IBE, GENERALI, UNIFI-DIEF

Milestones and deliverables

  • MS2Database of climatic drivers and socio-economic barriers completed M10
    Lead CNR-IBE
  • MS3Co-design workshops successfully implemented M14
    Lead UNIFI-DSG
  • D2.1Report on drivers, barriers and risk modelling M10 · PU
    Lead CNR-IBE
  • D2.2Framework for adaptive premiums and payouts M18 · PU
    Lead NOA